Residents of a South Mumbai building, completed in 2011 but receiving occupancy certificate in 2022, are facing issues with obtaining a drinking water connection. Both the builder and the BMC are reportedly uncooperative. Potential solutions include legal action against the builder for failing to provide this essential service, applying directly to the BMC for a connection, and considering a writ petition to the Bombay High Court, as access to drinking water is considered a fundamental right.