(Querist) 12 December 2022
This query is : Resolved
Our building in South Mumbai was made in 2011 but received Oc in Oct 2022. The water connection is still not there. Builder and BMC both are not co operating even after OC received. What we can do.
Residents of a South Mumbai building, completed in 2011 and receiving Occupancy Certificate (OC) in October 2022, are facing issues with their water connection. Despite the OC, neither the builder nor the BMC (Brihanmumbai Municipal Corporation) are cooperating to resolve the problem. The query seeks advice on what actions can be taken in this situation.
kavksatyanarayana
(Expert) 12 December 2022
A repeated query. Why repeated?
Dr J C Vashista
(Expert) 13 December 2022
Repeated See reply in original thread and avoid duplication.