Querry regarding - about the royalty against road cutting
RAJHANS MARATHE
(Querist) 08 September 2017
This query is : Open
Res. Mr. Soumitra Basu,
If a work of Road on Engineering,Procurement &Construction (EPC)Basis is awarded by the State PWD to the EPC Contractor which involves excavation in hard murum for improving the Road Geometrics in accordance with the EPC Contract Agreement .The necessary Right of Way i.e. land required for the Road work the later ad measuring to 20 meters in width and 15 Kilometers in length is handed over to the EPC Contractor by the State PWD for carrying out the work which is awarded to the EPC Contractor.
Sir,In this case What I want to know is that Whether the material obtained from the activity of excavation to improve the Road Geometrics in the width handed over to the EPC Contractor will attract Payment of Royalty Charges against the quantity of earth excavated ?
Sir, Further I will also like to know that out of the excavated soil if some quantity of soil is used for the embankment / filling in the same road work will it attract the Payment of Royalty Charges?
Rajhans Marathe