Fidic 1999 - sc 12.4 (a)


Referring to the subject clause SC 12.4 (a), me as the Contractor, may I claim the cost incurred in lieu of the unabsorbed overheads that was considered part of the Contract selling price, for the omitted scope.
Please advise.
Regards,
Reem Elhodhod  



Quick Summary
A contractor is asking if they can claim the cost of unabsorbed overheads for omitted scope under FIDIC SC 12.4(a). These overheads were part of the original contract selling price. The advice given is that yes, a claim is possible, and it's recommended to consult a local legal professional for guidance.

 2 Replies

Sourav Das (Advocate Supreme Court of India)     15 September 2022

Yes, you can.

Dr J C Vashista (Advocate)     15 September 2022

Show the document to a local prudent lawyer.