(Querist) 13 December 2017 This query is : Resolved 
Hello sir, we entered into collaboration agreement with a local builder in our locality in Delhi where the builder will construct stilt parking + four floor and one floor and parking area of his share to be given to him. After we vacate the premises he litetally, force us to make the basement also in the building citing reason that this is compulsory as our road is commercially notified road.

Now he started building the basement but the quality of the foundation is very poor, he hasn't appoint any structural engg for the same nor he has the drawings for the basement. part of basement has been constructed and we call one structural engineer for inspection and he told us that even the foundation is very week and architect design has Not been follow up while construction of basement foundation.

We haven't got the agreement registered in Court or the mcd. No GPa has been signed with the builder.

Now my question are
1. How can we cancel the agreement with him
2. We just need to file the case the in court's of law for cancel the agreement or do we need to get the eviction also from the builder.

3. As father and mother both r bedridden and their last wish is they want to see the newly constructed house, if we go for litigation how long it will take to get the possession back from the builder.
4. Do we need to pay the losses incur by the builder.
5. The builder has Already book his share
of flat and pressurizing us that he will take the corrective measure nd will complete the building.

6 there is no termination clause in the agreement

But our trust on builder us shaken and we want to terminate the collaboration agreement.

Pls reply
Thanks
Anoop
Guest (Expert) 13 December 2017
Better discuss in detail with local good advocate with all the evidences please.
Kumar Doab (Expert) 13 December 2017
Agreement is not registered in court implies that some agreement is signed.
Relate the variances with agreement.

Kumar Doab (Expert) 13 December 2017
It is certainly better to let a very able senior LOCAL counsel of unshakable repute and integrity specializing in such/civil matters and having successful track record, draft agreement to mind your interest and also to seek help if situation is so worse.

Does structural engineer opine that foundation can be corrected?
Has the proper approvals been obtained?
In case the map (approved or not) is violated then what is the point in continuing with violator?
In case you have slightest of inclination to continue then let your own LOCAL counsel
first opine based on what has transpired an defend your interest.